Metal - coloured aluminium veneers decorate the outer walls of office buildings
Metal - coloured aluminium veneers decorate the outer walls of office buildings
Metal - coloured aluminium veneers decorate the outer walls of office buildings
Metal - coloured aluminium veneers decorate the outer walls of office buildings
Metal - coloured aluminium veneers decorate the outer walls of office buildings
Metal - coloured aluminium veneers decorate the outer walls of office buildings
Price
US $26-30
Model
MNW-070701
Min. Order
50 cubic meter

Item specifics

Material
Aluminum Alloy
Thickness
0.5-1.2mm
Advantage
Easy Installation
Installation
Install Easily
Size
Customized Size
MOQ
50sqm
Application
Office Building

Product review

Description

Product Description
Detailed Images
The aluminum veneer uses 1100, 3003, 5005 aluminum alloy plates as the base material. The surface coating is divided into fluorocarbon spraying, powder spraying, polyester paint spraying,  and fluorocarbon preroller coating The fluorocarbon sprayed surface coating is divided into two coatings, one baking, three coatings, one baking, and three coatings and two backings. The powder coating surface coating is one coating and one baking.
1.light weight, good steel quality, high strength. 2. weather resistance and corrosion resistance. 3. the manufacturability is good. The aluminum plate can be processed into various complex geometries such as plane, arc shape and spherical surface. 4.The coating is uniform and has various colors. 5.It is not easy to be stained, and it is easy to clean and maintain. 6. The installation is convenient and quick. The aluminum plate is formed in the factory, and the construction site need not be cut and fixed on the framework. 7.Recyclable and reusable. 
Certificate
FAQ
Q1: Which third-party certificate you have passed?  A: ISO9001, ROHS, BV, SGS and so on.    Q2: Are you a factory or a trading company?  A: We are a factory   Q3: What size you can provide?  A: About thickness, we can provide from 0.2mm to 6mm.    Q4: How about the delivery time?  A: New production: Need about 15-35 days after receiving your down payment or LC Stock: After your down payment, we will deliver within about 10-20 days.    Q5: Sample Free?  A: Yes, but freight collected.    Q6: Payment term?  A: T/T,L/C,Yes,by T/T,30% deposite before production,70% balance before delivery.   Q7: where is your location?  A: We are located in Jinghai development, Tianjin .