High quality punched aluminum mesh

Group Curtain wall aluminum veneer
PriceUS $20-30 / cubic meter
Min. Order 1 cubic meter
Terms of Payment T/T
Update Time 2020-07-28
Item specifics
MaterialAluminum Alloy
Surface treatmentPVDF Coated
FunctionFireproof
Thickness3.0mm/customized
CertificationISO9001
AdvantageHeat Insulation.Waterpfoof
PAYMENT TERMT/T
MOQ200 Sqm
ColorRAL Color
  • Description
  • Product review
Product Description

Product Presentation

Aluminum perforated facade panel adopts 1100,3003,5005 aluminum alloy plate as base material. The surface coating is divided into fluorocarbon spraying, powder spraying, polyester paint spraying, fluorocarbon pre-roll coating. fluorocarbon sprayed surface coating according to the processing technology is divided into two coating one baking, three coating one baking and three coating two baking, powder sprayed surface coating for one coating one baking, the color can be provided by the company standard color card for customers to choose.

Certificate

Company Introduction


Tianjin Maynowei New material Technology Co., Ltd. is a professional comprehensive enterprise integrating design, research and development, production, sales and import and export trade, covering an area of about 25000 square meters. Products mainly include aluminum products, aluminum veneer, aluminum composite board, metal plate, building materials, decorative materials, environmental protection materials, metal products, steel and so on. Products are mainly used in curtain wall, airport, subway, municipal, school and other architectural decoration, the company to "high-quality products, convenient service, complete product mix,customer satisfaction evaluation" as the business policy. The company adheres to the "sincere service, for customers to do thebest" values, integrated products, to provide one-stop service. 

FAQ
Q1: Which third-party certificate you have passed?
A: ISO9001, ROHS, BV, SGS and so on.

Q2: Are you a factory or a trading company?
A: We are a factory

Q3: What size you can provide?
A: About thickness, we can provide from 0.2mm to 6mm.

Q4: How about the delivery time?
A: New production: Need about 15-35 days after receiving your down payment or LC Stock: After your down payment, we will deliver within about 10-20 days.

Q5: Sample Free?
A: Yes, but freight collected.

Q6: Payment term?
A: T/T,L/C,Yes,by T/T,30% deposite before production,70% balance before delivery.

Q7: where is your location?
A: We are located in Jinghai development, Tianjin .
    Loading...